PROJECT: Cabrillo Business Park - Goleta

PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Goleta, CA

Project Overview

Cabrillo Business Park – Goleta

Scope of Work

  1. Provide installation of a new overhead fire sprinkler system throughout proposed warehouse, as shown on provided plans and specifications.
  2. Install into open web joists.
  3. Sprinkler cover to cover new mezzanine per plans and specs and clouded areas labeled.
  4. Building construction is type III-B & approximately 45,000 ft.² in total area floor area. Systems to comply with the County of Santa Barbara Fire Department as well as NFPA-13, 2016 requirements for F-1, B occupancies.

Design:

  1. Warehouse to be ESFR system with 12 heads flowing at 20psi.
  2. Warehouse to be ordinary hazard II .20@1500sqft
  3. Precision Fire’s point of connection to be 6” underground @ 6” above finished grade.
  4. Fire sprinkler riser to include electronic flow switch, and electronic 10-inch fire bell (installation of bell by others & wiring to bell and flow switch also to be done by others)
  5. Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019.
  6. All above ground piping shall be steel sch. 7, 10, 30 & 40 with threaded and or grooved/mechanical fittings.
  7. Work shall include all materials, labor, plans and plan submittal, city business license, rough & final fire sprinkler inspections.
  8. Design-Build Engineering will be provided with our services.