PROJECT STATS

    • Industry
    • Industrial
    • Location
    • Venice, CA

Project Overview

VA Linear Accelerator – Venice

Scope of Work

  • Sprinkler coverage will be provided below new suspended and hard lid ceilings only as shown on provided plans and specifications.  
  • Existing upright coverage shall remain the same with no change. Heads will be spaced light hazard for “Group 1-2”” occupancies.  
  • Provide demo of existing drops.  
  • Includes FPE/NICET verified plans. 
  • Fire Sprinkler Heads installed under T-Bar shall be center of tile respectively.  
  • Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019. 
  • All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and the City of Los Angeles Building and Safety. 
  • Design-Build Engineering will be provided with our services. 
  • Work shall include all materials, labor, plans, shop drawings, plan submittal, rough and final inspections. 
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()