PROJECT: VA Linear Accelerator - Venice

PROJECT STATS

    • Industry
    • Industrial
    • Location
    • Venice, CA

General Description:

  • Sprinkler Coverage:
    • Provide sprinkler coverage below new suspended and hard lid ceilings as per the provided plans and specifications.
    • Existing upright sprinkler coverage will remain unchanged.

Specific Requirements:

  • Head Spacing:
    • Sprinkler heads will be spaced for light hazard occupancies for “Group 1-2”.
  • Demolition:
    • Perform demolition of existing drops as required.
  • Plans and Verification:
    • Includes FPE (Fire Protection Engineering) and NICET (National Institute for Certification in Engineering Technologies) verified plans.
  • Installation Specifics:
    • Fire sprinkler heads installed under T-Bar ceilings must be centered in the tile.
    • All new fire sprinklers to be quick response type as per NFPA 13 (2019 edition).
  • Piping:
    • All added or relocated piping must comply with local standards, NFPA 13 (2016 edition), and the City of Los Angeles Building and Safety regulations.

Services Provided:

  • Design-Build Engineering:
    • Design-Build Engineering services will be provided as part of the contract.
  • Materials and Labor:
    • Work includes all necessary materials, labor, plans, shop drawings, plan submittal, and both rough and final inspections.