Project Overview
Honey – Los Angeles
Scope of Work
- Sprinkler coverage will be provided below new suspended and hard lid ceilings only as shown on provided plans and specifications.
- Sprinklers shall be relocated to accommodate new full height walls for future tenants.
- Flat Concealed Fire Sprinkler to be included in areas of new ceiling.
- Allowance shall be 1,300.00 per floor for rework of pipe for MEP at 50Ft Maximum.
- Coordination Drawings to be provided during the design build process.
- Existing upright coverage shall remain the same with no change. Heads will be spaced light hazard for “B” occupancies.
- Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019. (Flat Concealed Sprinkler Heads if applicable).