PROJECT: Honey – Los Angeles

PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Los Angeles, CA

Project Overview

Honey – Los Angeles

Scope of Work

  • Sprinkler coverage will be provided below new suspended and hard lid ceilings only as shown on provided plans and specifications.
  • Sprinklers shall be relocated to accommodate new full height walls for future tenants.
  • Flat Concealed Fire Sprinkler to be included in areas of new ceiling.
  • Allowance shall be 1,300.00 per floor for rework of pipe for MEP at 50Ft Maximum.
  • Coordination Drawings to be provided during the design build process.
  • Existing upright coverage shall remain the same with no change. Heads will be spaced light hazard for “B” occupancies.
  • Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019. (Flat Concealed Sprinkler Heads if applicable).