PROJECT STATS

    • Industry
    • Education
    • Location
    • Santa Barbara, CA

Project Overview

Midland School – Santa Barbara

Scope of Work

  • Provide full fire sprinkler coverage throughout proposed residence as required per NFPA 13D and jurisdiction requirements of County of Santa Barbara Fire Department 
  • Building construction is type V-B. Systems to comply with the City of Ventura Fire Department as well as NFPA-13D, 2019 requirements for “R3” occupancies.  
  • Sprinkler coverage will be provided through out structures. Heads will be spaced for light hazard residential, fire sprinkler spacing to be at maximum 256 sq. ft.   
  • All sprinkler heads shall be quick response concealed.  
  • Fire sprinkler riser to include, electronic flow switch, and electronic 6-inch fire bell (installation of bell, wiring of bell & flow switch by others) 
  • Work shall include all materials, labor, plans, design calculations, shop drawings, design coordination meetings, plan submittal, rough & final fire sprinkler inspections. 
  • Design-Build Engineering will be provided for this project. 
  • Copies of Permits & Approved Fire Sprinkler Plans to be provided to Client upon request. 
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()