PROJECT: Nike – Los Angeles

PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Los Angeles, CA

Project Overview

Nike – Los Angeles

Scope of Work

  • Sprinkler coverage will be provided below new suspended and hard lid ceilings only as shown on provided plans and specifications.
  • Existing upright coverage shall remain the same with no change. Heads will be spaced ordinary hazard for “M” & “S-1” occupancies.
  • Existing upright protection is at density of 100sq.
  • Fire Sprinkler Heads installed under T-Bar shall be center of tile respectively.
  • Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019. (Flat Concealed Sprinkler Heads if applicable).
  • All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and the City of Los Angeles Building and Safety.
  • Work shall include all materials, labor, design build plans and plan submittal, city business license, rough and final inspections.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()