PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Los Angeles, CA

Project Overview

Dietetics Building – Los Angeles

Scope of Work

  1. Provide installation of a new overhead fire sprinkler system throughout proposed VA Building, as shown on provided plans and specifications.
  2. Building construction is type IIB & approximately 28,000 ft.2 in total area floor area. Systems to comply with the City of Ventura Fire Department as well as NFPA-13, 2019 requirements for B, S-2, F-1 occupancies.
  3. Provide Freezer sprinkler heads in cooler areas.
  4. Sprinkler coverage will be provided throughout structure. Heads will be spaced for ordinary & light occupancies.
  5. Fire sprinkler spacing to be a maximum of 130 sq. ft. & 225 sq. ft. in light hazard areas.
  6. Precision Fire’s point of connection to be 6” above finished grade.
  7. Includes Risers, Mains, Drops, Hanger & Seismic Bracing.
  8. Fire sprinkler riser to include electronic flow switch, and electronic 10-inch fire bell (installation of bell by others & wiring to bell and flow switch also to be done by others)
  9. Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019.
  10. All above ground piping shall be but not limited to steel sch. 7, 10, 30 & 40 with threaded and/or Victaulic grooved/mechanical fittings.
  11. Work shall include all materials, labor, plans, design calculations, shop drawings, design coordination meetings, plan submittal, rough & final fire sprinkler inspections.
  12. Design-Build Engineering will be provided for this project.
  13. Copies of Permits & Approved Fire Sprinkler Plans to be provided to Client upon request.