PROJECT STATS
- Industry
- Retail
- Location
- Sherman Oaks, CA
Project Overview
Zumiez – Sherman Oaks
Scope of Work
- Sprinkler coverage will be provided below new exposed and T-bar ceilings only as shown on provided plans and specifications.
- Sprinkler to cut from dropped ceiling to upright coverage.
- Sprinkler coverage to be center of ceiling tile.
- Existing upright coverage shall remain the same with no change. Heads will be spaced ordinary hazard for “M” occupancies.
- Fire sprinklers in new scope of work to be new quick response per NFPA 13 2016
- All piping to meet local and NFPA 13 2016 standards and the City of Los Angeles Building and Safety.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()