PROJECT STATS

    • Industry
    • Retail
    • Location
    • Sherman Oaks, CA

Project Overview

Zumiez – Sherman Oaks

Scope of Work

  • Sprinkler coverage will be provided below new exposed and T-bar ceilings only as shown on provided plans and specifications.
  • Sprinkler to cut from dropped ceiling to upright coverage.
  • Sprinkler coverage to be center of ceiling tile.
  • Existing upright coverage shall remain the same with no change. Heads will be spaced ordinary hazard for “M” occupancies.
  • Fire sprinklers in new scope of work to be new quick response per NFPA 13 2016
  • All piping to meet local and NFPA 13 2016 standards and the City of Los Angeles Building and Safety.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()