PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Oxnard, CA

Project Overview

New Trinity Community Church – OXNARD

Scope of Work

  • Provide approximately 115’ of underground from backflow to building.
  • All necessary excavation for new underground material and fill back. o Installation of (2) 90 Degree Fittings to reach in-building riser connection inside proposed building, to point of connection to install Fire Sprinkler Riser.
  • Fire sprinklers in new scope of work to be new quick response per NFPA 13 2016
  • All piping to meet local and NFPA 13 2016 standards and the City of Oxnard Fire Department. o Work shall include all materials, labor, plans and plan submittal, rough and final inspections.
  • Fire department connection installation
  • To include piping: 4”C 900 and ductile iron
  • All underground materials
  • Backhoe Excavation Design and hydraulic calculations
  • Plan submittal and approval
  • Concrete thrust blocks and restraints Installation labor
  • Underground flush inspection
  • Rough & final fire department inspections.
  • All underground piping to comply with all local fire, and California building codes as well as NFPA 24 requirements.
  • Trenching, backfill and compaction
  • Restoration of native ground covering such as grass, foliage, gravel, and landscaping
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()