PROJECT STATS
- Industry
- Commercial
- Location
- Oxnard, CA
Project Overview
Wells Fargo Bank – Oxnard
Scope of Work
- Sprinkler coverage will be provided below new suspended and hard lid ceilings only as shown on provided plans and specifications.
- Existing upright coverage shall remain the same with no change. Heads will be spaced light hazard for “B” occupancies.
- Fire Sprinkler Heads installed under T-Bar shall be center of tile respectively.
- Fire sprinklers to be new quick response per NFPA 13 2019. (Flat Concealed Sprinkler Heads if applicable).
- All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and the City of Oxnard Fire Department.
- All materials, labor, design build plans and plan submittal, city business license, rough and final inspections.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()