PROJECT STATS
- Industry
- Residential
- Location
- Simi Valley, CA
Project Overview
Milgard Manufacturing – Simi Valley
Scope of Work
- Sprinkler coverage will be provided to paint booths below new suspended and hard lid ceilings only as shown on provided plans and specifications.
- Existing upright warehouse coverage shall remain the same with no change. Heads will be spaced ordinary hazard for “M” occupancies.
- Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019.
- All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and the County of Ventura Fire Department.
- Design-Build Engineering will be provided with our services.
- Work shall include all materials, labor, plans, shop drawings, plan submittal, rough and final inspections.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()