PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Camarillo, CA

Project Overview

Design Space Modular Buildings – Camarillo

Scope of Work

  1. Provide installation of a new overhead fire sprinkler system throughout proposed Modular Space, as shown on provided plans and specifications.
  2. Building construction is type VB. Systems to comply with the County of Los Angeles Fire Department as well as NFPA-13, 2019 requirements for B occupancies.
  3. Labor includes prevailing wages.
  4. Sprinkler coverage will be provided throughout structure. Heads will be spaced for ordinary occupancies. Fire sprinkler spacing to be a maximum of 225 sq. ft.
  5. Precision Fire’s point of connection to be 6” above finished grade.
  6. Includes Risers, Mains, Drops, Hangers & Seismic Bracing.
  7. Fire sprinkler riser to include electronic flow switch, and electronic 10-inch fire bell (installation of bell by others & wiring to bell and flow switch also to be done by others)
  8. Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019.
  9. All above ground piping shall be but not limited to steel sch. 7, 10, 30 & 40 with threaded and/or Victaulic grooved/mechanical fittings.
  10. Work shall include all materials, labor, plans, design calculations, shop drawings, design coordination meetings, plan submittal, rough & final fire sprinkler inspections.
  11. Design-Build Engineering will be provided for this project.
  12. Copies of Permits & Approved Fire Sprinkler Plans to be provided to Client upon request.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()