PROJECT STATS
- Industry
- Commercial
- Location
- Los Angeles, CA
Project Overview
Round 1 Bowling – Los Angeles
Scope of Work
- Provide Demolition of existing fire sprinkler drops to prepare for new Round 1 Bowling Facility. To Demo/ remove Drops and Arm-overs back to existing branch line.
- Price includes Addendum 1.
- Sprinkler Coverage to be added to open ceiling areas per NFPA 13 2019 Code.
- Sprinkler Pendant Coverage to be provided below new soffits, floating ceilings and suspended T-bar/ACT Ceilings per Plans and Specs.
- Sprinkler Coverage to be modified at full height walls.
- Existing upright coverage shall remain the same with no change. Heads will be spaced light hazard for “A- 2, A-3 S, B” occupancies.
- Fire Sprinkler Heads installed under T-Bar shall be center of tile respectively.
- Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019.
- All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and the County of Los Angeles Fire Department.
- Design-Build Engineering will be provided with our services.
- Work shall include all materials, labor, plans, shop drawings, plan submittal, rough and final inspections.
Permits and City Fees:
- City Permits and Fees are not included in the total price. We ask General Contractor to reimburse the cost of permit to Precision Fire Protection when received.
- Copies of Permits & Approved Fire Sprinkler Plans to be provided to Client upon request.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()