PROJECT: Mercedes - Los Angeles

PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Los Angeles, CA

Project Overview

Mercedes – Los Angeles

Scope of Work

  • Sprinkler coverage will be provided below new suspended and hard lid ceilings only as shown on provided plans and specifications. 
  • All new ceiling tile, T-bar, hard lid ceiling on 1st and 2nd floor shall be relocated and installed with new fire sprinkler heads if applicable.   
  • Added additional heads due to Delta #1 plan revision. 
  • Relocate existing 2-1/2” main and 1-1/2” branch lines due to relocated elevator. Also we will need to add additional upright protection around elevator shaft due to obstruction.  
  • Existing upright coverage shall remain the same with no change. Heads will be spaced light hazard for “B” occupancies.  
  • Fire Sprinkler Heads installed under T-Bar shall be center of tile respectively.  
  • Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019. (Flat Concealed Sprinkler Heads if applicable). 
  • All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and Long Beach Fire Department. 
  • Work shall include all materials, labor, design build plans and plan submittal, city business license, rough and final inspections. 
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()