PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Ventura, CA

Project Overview

Skate One – Ventura

Scope of Work

  1. Sprinkler coverage will be provided below new ceilings in digital printer room, spray booth & wheel print room as shown on provided plans and specifications.  
  2. Provide fire sprinkler connections to new dust collector. Heads in dust collector are existing. Precision Fire will connect to two existing outlets. 
  3. Existing upright coverage shall remain the same with no change. Heads will be spaced ordinary hazard for “F-1” occupancies.  
  4. Fire Sprinkler Heads installed under T-Bar shall be center of tile respectively.  
  5. Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019. 
  6. All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and the City of Ventura Fire Department. 
  7. Design-Build Engineering will be provided with our services. 
  8. Work shall include all materials, labor, plans, shop drawings, plan submittal, rough and final inspections. 
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()