PROJECT STATS

    • Industry
    • Commercial
    • Location
    • Oxnard, CA

Project Overview

Oxnard Union High School – Oxnard

Scope of Work

  • Sprinkler coverage will be provided below new suspended and hard lid ceilings only as shown on provided plans and specifications.  
  • Open Ceiling areas to be installed with upright protection, sprig-ups. 
  • Existing upright coverage shall remain the same with no change. Heads will be spaced light hazard for “B” & “A-4” occupancies.  
  • Fire Sprinkler Heads installed under T-Bar shall be center of tile respectively.  
  • Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019. 
  • All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and the City of Oxnard Fire Department. 
  • Design-Build Engineering will be provided with our services. 
  • Work shall include all materials, labor, plans, shop drawings, plan submittal, rough and final inspections. 
  • DIR prevailing wage rate determination: VEN-2020-1 BC/Fire Sprinkler Fitter used for project (Ventura County) 
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()