PROJECT STATS
- Industry
- Commercial
- Location
- Canoga Park, CA
Project Overview
Carmax – Canoga Park
Scope of Work
- Provide installation of a new overhead fire sprinkler system throughout proposed Carmax in Canoga Park, as shown on provided plans and specifications.
- Building construction is type B & approximately 10,566 ft.² in total area floor area. Systems to comply with the City of Los Angeles Building and Safety as well as NFPA-13, 2016 requirements for “B” occupancies.
- Sprinkler coverage will be provided throughout structure. Heads will be spaced for ordinary occupancies. Fire sprinkler spacing to be a maximum of 225 sq. ft.
- Work shall include all materials, labor, plans and plan submittal, rough & final fire sprinkler inspections.
- Fire sprinklers in new scope of work to be new quick response per NFPA 13 2016
- Fire sprinkler riser to include electronic flow switch, and electronic 10-inch fire bell (installation of bell by others & wiring to bell and flow switch also to be done by others)
- All above ground piping shall be steel sch. 7, 10, 30 & 40 with threaded and or grooved/mechanical fittings.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()