PROJECT STATS
- Industry
- Commercial
- Location
- Los Angeles, CA
Project Overview
Hampton Inn & Suites – Los Angeles
Scope of Work
- Sprinkler coverage will be provided below new suspended and hard lid ceilings only as shown on provided plans and specifications.
- Existing upright coverage shall remain the same with no change. Heads will be spaced ordinary hazard for “R-1” occupancies.
- Fire Sprinkler Heads installed under T-Bar shall be center of tile respectively.
- Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019. (Flat Concealed Sprinkler Heads if applicable).
- All piping to be added and/or relocated are to meet local and NFPA 13 2016 standards and the City of Los Angeles Building and Safety.
- Work shall include all materials, labor, design build plans and plan submittal, city business license, rough and final inspections.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()