PROJECT STATS
- Industry
- Residential
- Location
- Ventura, CA
Project Overview
Residential Beach House – Ventura
Scope of Work
- Provide full fire sprinkler coverage throughout proposed residence as required per NFPA 13D and jurisdiction requirements of LADBS.
- Building construction is type V-B. Systems to comply with the City of Ventura Fire Department as well as NFPA-13D, 2019 requirements for “R3” occupancies.
- Sprinkler coverage will be provided through out structures. Heads will be spaced for light hazard residential, fire sprinkler spacing to be at maximum 256 sq. ft.
- Also, to include labor, system design and hydraulic calculations, plan submittal and approval, and rough & final fire department inspections.
All ()
Commercial ()
Residential / Hospitality ()
Industrial ()
Education ()