PROJECT: Waterfront Hotel - Santa Barbara

PROJECT STATS

    • Industry
    • Residential / Hospitality
    • Location
    • Santa Barbara, CA

Project Overview

Waterfront Hotel – Santa Barbara

Scope of Work

  1. Provide installation of a new overhead fire sprinkler system throughout proposed Hotel Building, as shown on provided plans and specifications.
  2. Building construction is type *** & approximately 130,000 ft.² in total area floor area. Systems to comply with the City of Ventura Fire Department as well as NFPA-13, 2019 requirements for R-1, B, M, A-3, S-1, U occupancies. 
  3. Sprinkler coverage will be provided throughout structure. Heads will be spaced for ordinary occupancies. Fire sprinkler spacing to be a maximum of 130 sq. ft. & 225 sq. ft. in light hazard areas.
  4. Precision Fire’s point of connection to be 6” above finished grade. Underground is excluded from work.
  5. Includes Risers, Mains, Drops, Hanger & Seismic Bracing.
  6. Coverage to be in elevators, trash chutes & Stairwells. 
  7. Coverage and Installation of fire riser at the detached “Compass Sports Building”.
  8. Fire Pump to include all labor and material needed to complete.  
  9. Fire sprinkler riser to include electronic flow switch, and electronic 10-inch fire bell (installation of bell by others & wiring to bell and flow switch also to be done by others)
  10. Fire sprinklers in new scope of work to be new quick response per NFPA 13 2019.